Accessibility settings

Settings are saved in this browser and apply on every page of the site.

Text size 100%

Accessibility is built into the site code. This menu is an extra, not a substitute.

HAMMER GIS

Software

Five GIS systems born from fieldwork with municipalities, engineers and field teams.

All software

Software

HAMMER CITY

The municipality's map site: every layer in one place, for every employee.

Software

SIGNYX

The traffic committee on the map: from request to decision.

Software

SEE.GMMA

The municipality extracts layers from aerial imagery itself, with AI.

Software

CLIMYX

Heat and shade at street level, to know where to plant and shade.

HAMMER CITY: 3D city blocks with building numbers, inside the system
CADabra: a CAD drawing turning into a GIS map (illustration)
SIGNYX: signs and road markings around a roundabout (illustration)
SEE.GMMA: layers interpreted from aerial imagery, with the layer list
CLIMYX: a 3D neighbourhood with trees and heat surfaces

Implementation & support

Scoping, setup, training and support, until your organisation runs its own GIS.

How we work

Project · Service & support

GIS system and call-centre dashboard for a regional council

A GIS system for the council, a call-centre dashboard with a map and charts, and external links that open straight from the map.

Project · Service & support

Resident maps: collection days, thematic maps and a road cross-section survey

ArcGIS Online apps for local authorities: waste and pruning collection days by address, comparison and thematic maps for residents, a road cross-section survey and self-survey forms.

Project · Service & support

A municipal asset-management app

All of the authority's property on one map: assets, plots, lease contracts and allocations, with an editing map, an editing table, a survey form and an assets dashboard.

Mapping

Focused jobs municipalities need from time to time: from the photo to the printed map.

All services

Mapping

Ortho-graphy

From one aerial image to dozens of GIS layers.

Project · Additional services

Aerial wall maps for council offices

Wall-sized aerial photo maps with boundaries and base layers for meeting rooms, offices and waiting areas.

3D

3D models

The city in 3D: buildings, trees and the skyline.

Projects

Work you can see on the map, by discipline.

All projects

Project · Surveys

Street-level urban heat-island map – Kiryat Yam

Heat factors coded from the aerial photo, shade computed every half hour, and all of it combined into one shading priority map at the level of streets, paths and bus stops.

Project · Software

CADabra: a real AS-MADE survey becomes GIS layers

A real survey file converted into GIS layers to the Survey of Israel specification: 99.5% of the data entities identified, grade A, with the coordinate system detected automatically.

Project · Surveys

Drainage surveys: inlets, manholes and lines on the map

Urban drainage infrastructure mapped on the aerial photo for two authorities: inlets, manholes, drainage lines and inlet lines, with a city-wide survey map and a dashboard.

Project · Additional services

A public GIS and a 3D city scene

A public GIS for browsing the city's layers, and a 3D scene of the city from the coastline to its towers.

EPSG:2039 For CEOs, mayors and city engineers

See the whole city. Decide faster.

One accurate, current picture of the territory you manage: infrastructure, assets, signs, trees and building changes. We collect the data in the field, put it into your own system, and make sure your departments actually work with it.

ILLUSTRATION · the city fills in as you move N · Scroll

ST-01 What municipal management tells us

Six problems we solve in every authority

We don't start from the software. We start from what is holding up your decision today.

  • Information is scattered

    Layers, files and spreadsheets sit with different departments and vendors, and nowhere shows the whole picture. Our answer: one map in Hebrew for every employee, on your own ArcGIS Online.

  • Decisions follow patrols and complaints

    Maintenance and budgets are planned around whoever saw something or called in. Our answer: a full field survey that puts every sign, pole, tree and hazard on the map, with a photo, sorted by priority.

  • Plans get stuck in DWG

    Surveys and plans arrive as AutoCAD files and never reach the system. Our answer: CADabra turns them into GIS layers with a quality report, before the data enters your organisation.

  • Unrecorded buildings and assets

    Building additions and unregistered assets stay outside inspection and planning. Our answer: an aerial-photo comparison that gives building inspection a sorted list, with a picture for every finding.

  • Obligations you must meet

    Signs, accessibility, drainage and lighting need a current inventory and documents. Our answer: surveys that deliver a clean layer with a known source and date, and a dashboard for day-to-day management.

  • Summer, heat and emergencies

    When you must decide fast, the data has to be ready in advance. Our answer: a street-level heat-island map to prioritise shade, and an emergency GIS that works without a network connection.

ST-02 From the field, in municipalities

What it gave the authorities we worked with

Real projects. Each has a page with the challenge, the solution and the deliverables.

ST-03 What each member of management gets

One project, four people who need to say yes

One project, four people who need to say yes
Option What it covers Fit / status
Mayor and CEO A picture of the city for the management meeting: dashboards, one map for every department and a wall map for the boardroom. Budget and maintenance decisions made on data, not on a hunch. Decision
City engineer Accurate layers in the Israeli grid, DWG plans that enter GIS with a quality report, and surveys with a known source and date. Accuracy
Treasurer and procurement A scope fixed in advance and in stages, a pilot before a wide commitment, and deliverables that stay with the authority. One supplier from the field to the system, no contractors to coordinate. Budget
CIO and IT We work on the authority's own ArcGIS Online and in open formats. No lock-in to us, a Hebrew and accessible interface, and permissions that stay in your hands. Systems

ST-04 In numbers

Who we are, briefly

  • ~20
    Close to two decades in mapping and geographic information
    Years
  • 5
    GIS software products we build ourselves
    Products
  • 6
    Kinds of field survey, from signs to orthophoto
    Surveys
  • 11
    Projects for municipalities and councils, with their deliverables on this site
    Authorities

ST-05 How to start

Four steps, no big commitment up front

Each step is closed and checked before the next one, and you decide whether to continue.

  1. ST-01

    A management briefing

    Half an hour at your office or online: what is holding things up, which decision you want to make faster, and who in the departments works with maps.

  2. ST-02

    A picture of what you have

    A review of the layers, maps, apps and permissions you already have, and a written priority list with scope and cost for each stage.

  3. ST-03

    A focused pilot

    One department, one neighbourhood or one survey, to see real value in the field and in the system before a wide commitment.

  4. ST-04

    Roll-out and support

    Extend to more departments, train staff and support them day to day. The data, layers and documents stay with the authority.

ST-06 Why trust us

What matters to whoever signs

  • Your data stays with you

    The work is done in the authority's own ArcGIS organisation and in open formats you can export at any time.

  • One supplier from field to system

    We survey, map and develop under one roof. Data collected in the street reaches the system without passing between vendors.

  • Hebrew and accessible

    Hebrew interfaces, the Israeli grid, and accessibility checks against Israeli standard 5568 in every product.

  • We say what works today

    A live product is marked live, one in development is marked as such, and an illustration is marked as an illustration. An unchecked number never leaves us.

ST-07 Management questions

What we are asked before we start

How much does it cost?

It depends on scope: the number of departments, the size of the area and the kind of survey. That is why we start with a picture of what you have, which ends in a priority list with scope and cost per stage, and you can begin with a small pilot.

Do we need ArcGIS?

Most of our work runs on Esri's ArcGIS Online, in the authority's own organisation. If you don't have it yet we help set it up. Surveys and deliverables also come in open formats and AutoCAD.

What happens to the data if we stop working with you?

Nothing. The layers, maps and documents sit in your organisation and in open formats. There is no lock-in to us.

Who on our side needs to be involved?

Someone from management who sets the goal, and one contact from each participating department. We do the rest, from collecting the data to training staff.

How soon do we see a result?

A pilot is scoped so you see a real deliverable, in the field and in the system, before deciding to expand. The timetable is set with you during the review of what you have.

ST-08

Which decision do you want to make faster?

Tell us in a few words, and we will get back to you to arrange a short briefing with your management. No long slide deck, just good questions.

= required